Large upgrades broken into sensible stages
Layout decisions come first
We agree electrical points before cables disappear behind finished surfaces.
Circuits tested before transfer
Existing defects are identified before connection to a new consumer unit.
Socket positions made useful
Outlet locations reflect room layouts rather than old wiring convenience.
Plan the electrical layout before renovation advances
Major refurbishment is the right time to decide where sockets, lights and appliance supplies should go. We carry out full and partial rewiring in Romford for ageing installations, repeated defects and redesigned layouts. A full rewire covers circuits across the property, while partial work targets an agreed section. Before first-fix cabling begins, we discuss room use, future demand and equipment positions. Rewiring needs access to walls, floors and rooms, so coordinating with builders, plasterers and decorators helps avoid opening finished areas twice.


Upgrade the board and finish the useful details
Consumer unit replacement can form part of wider electrical improvement. We assess and test circuits before transferring them because modern protective devices may reveal defects that older equipment did not detect. The new board is then installed, labelled and tested, with relevant documentation provided. Socket installation can complete the practical layout, placing outlets where furniture and appliances actually need them. For projects in Romford, share plans, access limits and preferred positions early. Larger electrical work can be supported by additional personnel when required.
Frequently asked questions
What access is needed for a rewire?
We may need access to floors, walls, ceilings, rooms and existing electrical routes. Furniture and belongings often need moving. We explain the likely disruption and coordinate stages with other renovation work where possible.
Can a consumer unit be replaced during rewiring?
Yes, the consumer unit and circuit arrangement are commonly considered as part of a rewiring project. We assess the installation, plan the board and protection, then inspect and test completed circuits before service.
When should final socket positions be agreed?
Agree them before first-fix cabling. Use furniture, kitchen and appliance plans to mark practical locations and heights. Late changes can mean reopening surfaces or altering completed cable routes, which adds disruption.

